Precious Metals
GR Silver Mining (TSXV:GRSL) Reports Results from Plomosas Mine Area, Intersecting 5.8 m at 427g/t Ag
GR Silver Mining (TSXV:GRSL) has reported new results from its final round of underground drilling at the Plomosas Mine Area during its 2022 infill and…
GR Silver Mining (TSXV:GRSL) has reported new results from its final round of underground drilling at the Plomosas Mine Area during its 2022 infill and exploratory drilling program at the Plomosas Project in Mexico. The company drilled all 28 drill holes in the announcements from within the historic Plomosas Mine Area, mainly about the 900 level.
Drill targeted the wide polymetallic Plomosas Breccia in unmined areas close to existing underground development and access. Objectives for the infill drilling program were achieved and delineated new mineralized zones, replacing un-sampled historical holes that were previous adopted in the 2021 resource estimation.
GR Silver Mining Chairman and CEO, Eric Zaunscherb commented in a press release: “The upcoming resource estimation is expected to define a significant resource dominated by silver mineralization over broad widths, relatively close to surface or existing underground infrastructure. We consider these attributes to contribute to GR Silver Mining’s competitive advantages, along with project scale and prospectivity, and the management and board skills to take the project to the next level. We anticipate a potential market re-rating related to the resource estimation update, based on scale and quality of resources.”
Highlights from the results are as follows:
- PLIP22-094: 21.7 m at 158 g/t Ag, 0.05 g/t Au, 1.9% Pb, 1.8% Zn and 0.1% Cu (301 g/t AgEq1)
including: 5.8 m at 427 g/t Ag, 0.09 g/t Au, 4.9% Pb, 1.4% Zn and 0.1% Cu (648 g/t AgEq) - PLIP22-092: 13.0 m at 161g/t Ag, 0.20 g/t Au, 1.0% Pb, 1.5% Zn and 0.1% Cu (273 g/t AgEq)
- PLIP22-089: 5.4 m at 325 g/t Ag, 0.54 g/t Au, 3.1% Pb, 2.5% Zn and 0.1% Cu (567g/t AgEq)
including: 2.5 m at 524 g/t Ag, 0.19 g/t Au, 2.7% Pb, 0.8% Zn and 0.1% Cu (660 g/t AgEq) - PLIP22-078: 4.7 m at 277 g/t Ag, 0.75 g/t Au, 7.5% Pb, 2.1% Zn and 0.2% Cu (666 g/t AgEq)
The drilling results continue to reveal attractive wide high-grade silver-polymetallic mineralization in unmined areas at the upper levels of the historic underground mine. These results continue to demonstrate the potential to incorporate wide and attractive polymetallic results into the upcoming resource estimation, scheduled for completion by the end of Q1|2023.
The 186 drill holes (11,750 metres), completed by GR Silver Mining at the Plomosas Mine Area since the 2021 resource estimation, have added important core drilling in specific areas of the existing NI 43-101 resource block model, which together with 36,400 metres of historical drilling completed by First Majestic, Aurcana and IMMSA, provide a higher density and confidence of information for the resource estimation in progress.
Table 1: Plomosas Mine Area – Latest Results Highlights
Drill Hole | From (m) | To (m) | Apparent
width (m) |
True width
(m) |
Ag g/t | Au g/t | Pb % | Zn % | Cu % | AgEq g/t |
PLI22-53 | 2.3 | 3.8 | 1.5 | 1.0 | 270 | 0.15 | 0.8 | 1.1 | na | 348 |
42.4 | 45.8 | 3.4 | 2.9 | 251 | 0.01 | 2.2 | 2.4 | na | 412 | |
PLIP22-60 | No significant intervals | |||||||||
PLIP22-61 | 6.3 | 8.3 | 2.0 | 1.7 | 80 | 0.01 | 0.4 | 0.5 | 0.1 | 118 |
PLIP22-62 | No significant intervals | |||||||||
PLIP22-64 | No significant intervals | |||||||||
PLIP22-66 | 0.8 | 14.1 | 13.2 | 8.5 | 44 | 0.06 | 0.3 | 0.4 | na | 74 |
PLIP22-71 | 0.0 | 7.7 | 7.7 | 6.3 | 8 | 0.08 | 0.8 | 0.6 | na | 61 |
PLIP22-72 | 0.0 | 1.9 | 1.9 | 1.9 | 23 | 2.31 | 1.9 | 3.8 | na | 437 |
PLIP22-73 | No significant intervals | |||||||||
PLIP22-74 | 0.8 | 13.0 | 12.2 | 12.2 | 42 | 0.70 | 0.5 | 0.4 | na | 139 |
PLIP22-75 | 2.0 | 6.1 | 4.1 | 4.1 | 3 | 0.13 | 0.8 | 0.5 | na | 57 |
PLIP22-76 | No significant intervals | |||||||||
PLIP22-78 | 4.8 | 9.5 | 4.7 | 4.7 | 277 | 0.75 | 7.5 | 2.1 | 0.2 | 666 |
PLIP22-79 | No significant intervals | |||||||||
PLIP22-80 | No significant intervals | |||||||||
PLIP22-82 | 1.3 | 4.6 | 3.3 | 3.3 | 37 | 0.08 | 0.1 | 0.2 | na | 56 |
PLIP22-84 | No significant intervals | |||||||||
PLIP22-85 | 0.0 | 5.3 | 5.3 | 4.3 | 23 | na | 1.1 | 6.0 | 0.1 | 293 |
0.0 | 0.9 | 0.9 | 0.7 | 48 | 0.01 | 4.3 | 17.2 | 0.2 | 849 | |
PLIP22-86 | 0.0 | 5.3 | 5.3 | 3.4 | 24 | 0.04 | 1.9 | 2.0 | na | 161 |
PLIP22-87 | 1.6 | 9.3 | 7.7 | 5.9 | 7 | 0.06 | 0.4 | 0.4 | na | 40 |
PLIP22-88 | 6.5 | 13.2 | 6.8 | 5.9 | 45 | 0.09 | 0.1 | 0.1 | na | 62 |
PLIP22-89 | 9.0 | 14.3 | 5.4 | 4.7 | 325 | 0.54 | 3.1 | 2.5 | 0.1 | 567 |
10.9 | 13.4 | 2.5 | 2.0 | 524 | 0.19 | 2.7 | 0.8 | 0.1 | 660 | |
PLIP22-90 | 5.2 | 6.5 | 1.3 | 0.8 | 46 | 0.11 | 2.2 | 3.5 | 0.1 | 258 |
PLIP22-92 | 5.6 | 18.6 | 13.0 | 11.3 | 161 | 0.20 | 1.0 | 1.5 | 0.1 | 273 |
PLIP22-93 | 11.7 | 14.7 | 3.0 | 2.6 | 210 | 0.03 | 0.8 | 0.2 | 0.1 | 257 |
11.7 | 12.3 | 0.6 | 0.5 | 485 | 0.09 | 4.3 | 0.2 | 0.3 | 660 | |
PLIP22-94 | 0.0 | 21.7 | 21.7 | 19.7 | 158 | 0.05 | 1.9 | 1.8 | 0.1 | 301 |
9.3 | 15.1 | 5.8 | 5.3 | 427 | 0.09 | 4.9 | 1.4 | 0.1 | 648 | |
PLIP22-95 | No significant intervals | |||||||||
PLIP22-96 | 7.4 | 9.4 | 2.1 | 2.0 | 276 | 0.01 | 0.5 | 1.1 | na | 338 |
14.3 | 19.4 | 5.2 | 3.3 | 43 | 0.06 | 1.1 | 0.5 | na | 103 |
Numbers may be rounded. Results are uncut and undiluted. “na” = no significant result |
* AgEq calculations using US$20.00/oz Ag, US$1,600/oz Au, US$0.90/lb Pb, US$1.10/lb Zn and US$3.00/lb Cu, with metallurgical recoveries of Ag – 74%, Au – 86%, Pb – 69%, Zn –75% and Cu – 80%. AgEq = ((Ag grade x Ag Price x Ag recovery) + (Au grade x Au price x Au recovery) + (Pb grade x Pb price x Pb recovery) + (Zn grade x Zn price x Zn recovery) + (Cu grade x Cu price x Cu recovery))/(Ag price x Ag recovery) |
Table 2: Plomosas Mine Area Latest Drill Hole Details
Drill Hole | East (m) | North (m) | RL (m) | Dip (˚) | Azimuth (˚) | Depth (m) | Drill Hole Type |
PLI22-53 | 451307 | 2551909 | 818 | 55 | 270 | 78.0 | Underground |
PLIP22-60 | 451532 | 2552237 | 897 | 45 | 310 | 16.0 | Underground |
PLIP22-61 | 451517 | 2552066 | 917 | -44 | 110 | 18.7 | Underground |
PLIP22-62 | 451512 | 2552050 | 919 | -44 | 140 | 16.5 | Underground |
PLIP22-64 | 451474 | 2552010 | 903 | -53 | 103 | 15.0 | Underground |
PLIP22-66 | 451473 | 2551899 | 903 | -32 | 50 | 14.7 | Underground |
PLIP22-71 | 451297 | 2551672 | 801 | -47 | 65 | 17.75 | Underground |
PLIP22-72 | 451325 | 2551606 | 801 | -50 | 50 | 18.0 | Underground |
PLIP22-73 | 451350 | 2551595 | 802 | -60 | 47 | 16.0 | Underground |
PLIP22-74 | 451409 | 2551539 | 804 | -26 | 320 | 15.0 | Underground |
PLIP22-75 | 451415 | 2551561 | 804 | -25 | 329 | 15.0 | Underground |
PLIP22-76 | 451312 | 2551886 | 817 | 0 | 141 | 31.0 | Underground |
PLIP22-78 | 451232 | 2551853 | 801 | -25 | 115 | 41.5 | Underground |
PLIP22-79 | 451377 | 2551581 | 802 | -45 | 60 | 15.0 | Underground |
PLIP22-80 | 451378 | 2551568 | 803 | -43 | 85 | 14.0 | Underground |
PLIP22-82 | 451345 | 2551862 | 851 | -50 | 80 | 21.25 | Underground |
PLIP22-84 | 451410 | 2552076 | 854 | 0 | 270 | 12.4 | Underground |
PLIP22-85 | 451336 | 2551983 | 853 | -20 | 260 | 20.5 | Underground |
PLIP22-86 | 451337 | 2551961 | 853 | -45 | 90 | 12.5 | Underground |
PLIP22-87 | 451396 | 2551889 | 852 | -20 | 70 | 29.0 | Underground |
PLIP22-88 | 451428 | 2551885 | 852 | -45 | 80 | 38.0 | Underground |
PLIP22-89 | 451345 | 2551739 | 842 | -80 | 110 | 28.0 | Underground |
PLIP22-90 | 451331 | 2551733 | 844 | 0 | 260 | 19.4 | Underground |
PLIP22-92 | 451400 | 2551467 | 882 | -30 | 90 | 40.5 | Underground |
PLIP22-93 | 451367 | 2551951 | 881 | -30 | 90 | 14.7 | Underground |
PLIP22-94 | 451387 | 2551974 | 880 | -28 | 90 | 21.65 | Underground |
PLIP22-95 | 451330 | 2551892 | 873 | -90 | 0 | 8.0 | Underground |
PLIP22-96 | 451342 | 2551939 | 869 | -20 | 70 | 21.0 | Underground |
Note: WGS84 Datum |
The above references an opinion and is for information purposes only. It is not intended to be investment advice. Seek a licensed professional for investment advice. The author is not an insider or shareholder of any of the companies mentioned above.
The post GR Silver Mining (TSXV:GRSL) Reports Results from Plomosas Mine Area, Intersecting 5.8 m at 427g/t Ag appeared first on MiningFeeds.
Canadian Silver Co. Will See Big Changes in 2024
Source: Michael Ballanger 12/22/2023
Michael Ballanger of GGM Advisory Inc. takes a look at the current state of the market and shares on stock…
EGR options out Urban Berry project in Quebec to Harvest Gold – Richard Mills
2023.12.23
EGR Exploration Ltd. (TSXV: EGR) has moved from owner to shareholder at its Urban Berry project in Quebec, this week announcing it is optioning…
Crypto, Crude, & Crap Stocks Rally As Yield Curve Steepens, Rate-Cut Hopes Soar
Crypto, Crude, & Crap Stocks Rally As Yield Curve Steepens, Rate-Cut Hopes Soar
A weird week of macro data – strong jobless claims but…