Connect with us

Energy & Critical Metals

Locksley confirms rare earths potential just 1.5km from giant Mountain Pass mine

Special Report: Locksley Resources has reported solid assay results from seven stream sediment samples at its Mojave Rare Earth Element … Read More
The…

Share this article:

Published

on

This article was originally published by Stockhead
  • Stream sediment sampling returns up to 0.26% TREO at Mojave project in the US
  • The project sits next to the Mountain Pass mine which accounts for ~15% of global supply
  • A new area of REE potential has been identified at North Block
  • Drilling planned in the near-term

 

Locksley Resources has reported solid assay results from seven stream sediment samples at its Mojave Rare Earth Element (REE) project in California, USA.

The Mojave project is next to MP Materials’ Mountain Pass mine, the largest rare earths project in the Western world, accounting for ~15% of global supply.

The company has already reported high-grade rock chips up to 12% TREO and 3.19% NdPr at El Campo and this latest round of sampling has returned assays ranging from 0.103% to 0.26% TREO.

Locksley Resources (ASX:LKY) management says the results represent a new area of REE potential amongst Mojave’s North Block, with four stream sediments with TREO’s ranging from 0.13% to 0.21% just 1.5km from the Mountain Pass mine.

 

A new area of REE potential

A total of 51 stream sediment samples were collected within the North Block claim, separate to the already existing identified 860m striking interpreted mineralised horizon associated with high-grade outcropping samples at the El Campo Lease.

The sampling points with anomalous elevated REE geochemistry, especially if condensed, indicate the possibility of a REE deposit upstream from where the samples were collected.

“The recent stream sediment sampling program has provided further encouraging grades, indicating six catchment areas with elevated TREO results up to 0.26%,” LKY managing director Steve Woodham said.

“These elevated results at the North Block prove the entire area is prospective for REE and provides the group with further potential drilling targets.”

 

Locksley Resources ASX LKY
North Block stream sediment assay results and localities in relation to the El Campo prospect. Pic via Locksley

 

Drilling planned in the near-term

The company has lodged applications with the Bureau of Land Management for core drilling to test the down dip continuity of mineralisation, with priority holes targeting the down-plunge at El Campo’s monster 12.1% TREO lode.

Drilling of the six new catchment targets is also being considered at the North Block.

“The company is well funded to commence further work and the board look forward to informing the market closer to the commencement of drilling,” Woodham said.

 

Locksley Resources ASX LKY
Source of REE mineralisation relative to elevated REE stream sediment samples. Pic via Locksley

 


 

This article was developed in collaboration with Locksley Resources, a Stockhead advertiser at the time of publishing.

 

This article does not constitute financial product advice. You should consider obtaining independent advice before making any financial decisions.

The post Locksley confirms rare earths potential just 1.5km from giant Mountain Pass mine appeared first on Stockhead.



Share this article:

Uranium Exploration Company Announces Additional Staking in the Athabasca Basin

Source: Streetwise Reports 12/22/2023

Skyharbour Resources Ltd. announced an update from its Canada-based Falcon Project along with additional…

Share this article:

Published

on

By

Continue Reading
Energy & Critical Metals

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla has launched a new mega factory…

Share this article:

Published

on

Continue Reading
Energy & Critical Metals

Giving thanks and taking stock after “a remarkable year”

An end-of-year thank you to our readers, industry colleagues and advertisers before Electric Autonomy breaks from publishing until Jan. 2
The post Giving…

Share this article:

Published

on

Continue Reading

Trending