Connect with us

Energy & Critical Metals

Lithium Ionic drills 1.62% Li2O over 20 metres at Bandeira, Brazil

Lithium Ionic Corp. [LTH-TSXV; LTHCF-OTCQB; H3N-FSE] reported assay results from its 100%-owned Bandeira property as…

Share this article:

Published

on

This article was originally published by Resource World

Lithium Ionic Corp. [LTH-TSXV; LTHCF-OTCQB; H3N-FSE] reported assay results from its 100%-owned Bandeira property as part of a 30,000-metre drill program at the Itinga project, located within the lithium-rich Aracuai district in the state of Minas Gerais, Brazil. The results from this campaign will culminate in an initial mineral resource estimate expected this quarter.

Bandeira is located approximately 500 metres south of Companhia Brasileira de Litio’s (CBL) Cachoeira lithium mine, and approximately 700 metres north of Sigma Lithium Corp.’s large Barreiro lithium deposit. The company is currently the second largest mineral rights holder in the region, controlling 14,182 hectares in this emerging hard rock lithium-producing district.

Bandeira drill intercept highlights: 1.62% Li2O over 20 metres (hole ITDD-23-062). Drilled in the northernmost extent of the property, this hole intersected a new high-grade zone of mineralization approximately 104 metres down hole (~80 metres from surface); 1.42% Li2O over 15.8 metres and 1.73% Li2O over 11 metres (hole ITDD-23-078). Intersected 300 metres down-dip from previously reported holes ITDD-23-054 and ITDD-23-058 which intersected 1.84% Li2O over 6.45 metres and 1.44% Li2O over 6 metres, respectively.

Extension to be confirmed with pending holes ITDD-23-084 and ITDD-23-078; 1.24% Li2O over 18.1 metres, 1.99% Li2O over 6.7 metres, 1.66% Li2O over 8 metres and 2.10% Li2O over 4 metres (hole ITDD-23-073).

Identified several well-mineralized intersections, the thickest of which is located ~500 metres from surface and 700 metres down-dip from previously reported holes ITDD-22-024 (1.71% Li2O over 5.7 metres and 2.46% Li2O over 2 metres) and ITDD-22-025 (2.22% Li2O over 3.7 metres); 2.03% Li2O over 4.3 metres, 1.44% Li2O over 5.1 metres and 1.79% Li2O over 2.8 metres (hole ITDD-23-060); 1.62% Li2O over 8 metres (hole ITDD-23-081).

A highlight interval among a group of positive results in the south end of the property, which intersected a shallow (~80 metres from surface) mineralized pegmatite zone, discordant to the regional foliation.

Blake Hylands, P.Geo., CEO, commented, “We are very encouraged by the ongoing positive results across the Bandeira property. We continue to encounter new zones of mineralization at surface and meaningful extensions at depth, supporting the significant scale potential of the pegmatite vein system on our property. While we approach the point when we lock the data base to be included in the initial mineral resource estimates for Bandeira and Galvani, on track for completion this quarter, definition drilling will continue on both properties to expand the resources that will be included in future resource updates. Our team is working closely with SGS Canada as they continue to analyze the database of results and construct the resource model.”

Only approximately 2,000 metres of drilling remains of the 30,000-metre drill program commenced in 2022 prior to the database for the initial mineral resource estimates at Bandeira and Galvani being closed for the resource estimate, however additional infill and expansion drilling will continue.

SGS Canada (SGS), a global leader in the estimation and modelling of mineral deposits has been engaged to complete the initial NI 43-101 mineral resource estimate, on track for completion in Q2 2023. SGS has significant direct experience with lithium deposits in the region, including Sigma Lithium Corp’s nearby deposits. This initial mineral resource estimate will serve as a foundation for further expansion as the Company continues to identify and drill new targets, guided by ongoing results.

The Bandeira and Galvani properties cover only 872 of the company’s 14,182 hectares land package in this unique hard-rock lithium district. The company has begun exploratory drilling with one rig at its Itira property, located less than a kilometre West of Galvani. In addition, as announced on May 1, 2023, a 20,000-metre drilling program is underway on claims within its newly acquired Salinas project, targeting lithium-rich spodumene-bearing pegmatites which are directly adjacent to Latin Resources’ 13.3Mt of 1.2% Li2O Colina deposit.

Lithium Ionic Corp. is a Canadian-based lithium-focused mining company with properties in the prolific Aracuai province in Minas Gerais State, Brazil, which boasts excellent infrastructure, including highways, access to hydroelectrical grid power, water, and nearby commercial ports.

tsxv
otcqb

tsxv-sgml

sigma lithium

Share this article:

Uranium Exploration Company Announces Additional Staking in the Athabasca Basin

Source: Streetwise Reports 12/22/2023

Skyharbour Resources Ltd. announced an update from its Canada-based Falcon Project along with additional…

Share this article:

Published

on

By

Continue Reading
Energy & Critical Metals

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla has launched a new mega factory…

Share this article:

Published

on

Continue Reading
Energy & Critical Metals

Giving thanks and taking stock after “a remarkable year”

An end-of-year thank you to our readers, industry colleagues and advertisers before Electric Autonomy breaks from publishing until Jan. 2
The post Giving…

Share this article:

Published

on

Continue Reading

Trending