Connect with us

Energy & Critical Metals

Kraken Energy signs definitive option deal for Utah uranium project

Historically, the region produced 240 million pounds of natural uranium ore concentrate.
The post Kraken Energy signs definitive option deal for Utah uranium…

Share this article:

Published

on

This article was originally published by Mining Technology

Kraken Energy has reached a definitive option deal to purchase up to a 75% of the Harts Point Uranium Property in Utah, US, from Atomic Minerals.

The agreement was announced earlier this month. As part of it, Kraken will operate the project and must incur a $1.5m expenditure within 18 months from the date of the options agreement to earn a 65% interest.

It has the option to increase the stake to 75% by incurring an additional $2m within 30 months and issuing two million shares to Atomic.

Kraken will also grant a 2% net smelter royalty to Atomic, subject to a 1% buydown for $5m.

After the initial option is selected, Kraken will own 65% and the remaining 35% will be owned by Atomic.

Once the extended option is opted, the ratio of ownership will be 75% and 25%, respectively and a joint venture agreement will be formed.

Located in the Colorado Plateau, Harts Point is 64km north of the White Mesa Uranium Mill.

It is also claimed to be the only fully licensed and operating conventional uranium mill in the US.

There are 324 lode mining claims at the property, covering an area of 2,622 hectares, with drill permits for up to 25 exploration drill holes upon paying $58,000 to the US Bureau of Land Management.

Historically, the Colorado Plateau produced more than 328 million pounds of natural uranium ore concentrate (U₃O₈) at 0.2% to 0.4% U₃O₈ since the 1950s.

Kraken stated that Harts Point is analogous to the Lisbon Valley where the Lisbon Valley Uranium District hosted 17 mines, which produced nearly 80 million pounds of U₃O₈ at 0.34% U₃O₈ between 1948 and 1988.

The uranium deposits at the site range from 100m to 3,048m in length, 2m to 13m in thickness, and 31m to 427m in width.

The White Mesa uranium processing facility is located 64km from the site.

Kraken Energy CEO Matthew Schwab said: “Harts Point is perfectly situated for a discovery between previously producing operations to the east and west and has historic drilling that shows ‘off-scale’ radioactivity within the property.

“With the significant upside potential at Harts Point and drill permits in place, our team is now finalising the remaining details to begin drilling on the property as soon as possible.”

The post Kraken Energy signs definitive option deal for Utah uranium project appeared first on Mining Technology.

Share this article:

Uranium Exploration Company Announces Additional Staking in the Athabasca Basin

Source: Streetwise Reports 12/22/2023

Skyharbour Resources Ltd. announced an update from its Canada-based Falcon Project along with additional…

Share this article:

Published

on

By

Continue Reading
Energy & Critical Metals

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla has launched a new mega factory…

Share this article:

Published

on

Continue Reading
Energy & Critical Metals

Giving thanks and taking stock after “a remarkable year”

An end-of-year thank you to our readers, industry colleagues and advertisers before Electric Autonomy breaks from publishing until Jan. 2
The post Giving…

Share this article:

Published

on

Continue Reading

Trending