Connect with us

Energy & Critical Metals

Equinor’s first solar plant in Poland ready for operation

Equinor’s subsidiary Wento has announced that the 58MW Stępień solar plant in Poland has been completed and is ready for operation.
The post Equinor’s…

Share this article:

Published

on

This article was originally published by Power Engineering International

Equinor subsidiary Wento has announced that the 58MW Stępień solar plant in Poland has been completed and is ready for operation.

Stępień is located in the Braniewo municipality, part of the Warmia region in the north of Poland.

According to Equinor, it’s one of Poland’s largest solar plants, comprising more than 100,000 solar panels over an area of around 65 hectares (161 acres).

It will produce 61GWh of power per year, enough to power 31,000 Polish households.

Have you read?
South Australia’s first solar digital mining centre
IEA calls for boost in Hungary’s renewable energy generation

Equinor bought the Polish solar developer Wento in 2021, taking over its pipeline of solar projects across Poland. This is the first completed solar plant following the acquisition.

Olav Kolbeinstveit, senior vice president for power and markets within Renewables at Equinor said in a statement: “With Wento, we are uniquely positioned to build a material solar portfolio in one of Europe’s most rapidly growing renewable energy markets. During the first year of our ownership, we sanctioned construction of three solar plants in Poland with a total capacity of 171MW.

Image credit: Equinor

“Today, we are proud to inaugurate our first solar plant Stępień, while the two other plants are expected to be ready in 2023-2024.”

Poland’s energy mix continues to include a number of conventional sources, however, the country is pushing to include more renewable energy. This is reflected in the Energy Policy of Poland until 2040, which aims to achieve 23-25GW installed renewable capacity in 2030.

Poland is going through a major energy transition and is actively developing domestic renewable energy to increase reliable power capacity and enhance energy security. Equinor aims to contribute to Poland’s aspirations by building a broad energy offering in the country, including onshore and offshore renewables”, says Michał Jerzy Kołodziejczyk, Equinor’s country manager in Poland.

Equinor plans to secure revenues by selling the plant’s electricity via PPAs.

The post Equinor’s first solar plant in Poland ready for operation appeared first on Power Engineering International.

Share this article:

Uranium Exploration Company Announces Additional Staking in the Athabasca Basin

Source: Streetwise Reports 12/22/2023

Skyharbour Resources Ltd. announced an update from its Canada-based Falcon Project along with additional…

Share this article:

Published

on

By

Continue Reading
Energy & Critical Metals

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla has launched a new mega factory…

Share this article:

Published

on

Continue Reading
Energy & Critical Metals

Giving thanks and taking stock after “a remarkable year”

An end-of-year thank you to our readers, industry colleagues and advertisers before Electric Autonomy breaks from publishing until Jan. 2
The post Giving…

Share this article:

Published

on

Continue Reading

Trending