Connect with us

Precious Metals

Tembo Gold drills 12.96 g/t gold over 5.54 metres at Tembo Project, Tanzania

Tembo Gold Corp. [TEM-TSXV; T23A-FSE] reported the first results of the 2022 diamond drilling campaign…

Share this article:

Published

on

This article was originally published by Resource World

Tembo Gold Corp. [TEM-TSXV; T23A-FSE] reported the first results of the 2022 diamond drilling campaign on the 100%-owned Tembo project in Tanzania. The company has designed a 7,000-metre program of drilling of which approximately 5,500 metres is expected to be completed before the drillers break commences in December.

Significant gold intersections have been achieved and structural interpretation of the results is providing an improved understanding of the controls in mineralization at the three targets, Ngula 1, Nyakagwe Village and Nyakagwe East.

A total of 3,353 metres of drilling has been completed at the three targets, Nyakagwe Village, Ngula 1, and Nyakagwe East, comprising a total of 18 drill holes. Best intersections returned included 12.96 g/t gold over 5.54 metres from 89.01 metres, including 29.67 g/t gold over 2.35 metres from 91.44 metres at Nyakagwe Village.

All holes logged and sampled to date intersected gold mineralization and confirmed the geological continuity of structures hosting the gold. The structural controls on mineralization are now being evaluated in detail to improve the targeting of future drilling planned for 2023, and the commencement of a resource-definition drill program.

Drilling has achieved a number of exceptional high-grade individual samples at Nyakagwe Village. TDD0162: 84.14 g/t gold over 0.67 metres from 89.61 metres. TDD0163: 37.43 g/t gold over 0.30 metres from 115.72 metres. TDD0164: 57.23 g/t gold over 0.30 metres from 57.28 metres.

Follow-up drilling will now focus on delineating the strike and plunge extensions of these high-grade intersections with the goal of defining an initial resource.

Additionally, new artisanal workings on Ngula 1 are to be mapped and sampled to complement the interpretation of the current drilling program and potentially identify new drill targets.

Tembo Exploration Manager, Hendrik Meiring, commented, “The initial drill program for this year has successfully confirmed the styles of mineralization and the key structural controls within the three targeted areas This new information is critical to the updating of our geological modeling and the focusing of the next stages of our drilling program.”

Tembo President and CEO, David Scott, stated, “Our 2022 drilling program has progressed well and results have been extremely encouraging, supporting and enhancing our geological understanding and confirming the presence of significant gold mineralization. This will assist in ensuring a well targeted follow-up drilling program in 2023 with the goal of initial resource definition.”

The Tembo Gold Project is located adjacent to Barrick’s 20Moz Bulyanhulu Mine in the prolific Lake Victoria Greenstone belt in Tanzania.

tsxv


tsxv-tem
tembo-gold-corp
tembo gold corp

Share this article:

Precious Metals

PBoC In A Hurry To Buy Gold: Covertly Bought 593 Tonnes Of Gold YTD

PBoC In A Hurry To Buy Gold: Covertly Bought 593 Tonnes Of Gold YTD

By Jan Nieuwenhuijs of Gainesville Coins

The PBoC is in a hurry to buy…

Share this article:

Continue Reading
Companies

Last Weeks Resource Stock Recap: Is it our turn yet? And Hercules……….

‘That’s a Wrap’ By Rod Blake Following last week’s plus 5% gains on the four…

Share this article:

Continue Reading
Economics

Central Bank Gold Buying Continued Unabated In September

Central Bank Gold Buying Continued Unabated In September

Via SchiffGold.com,

Central banks continued to gobble up gold…

Reported central…

Share this article:

Continue Reading

Trending