Connect with us

News Releases

Arizona Metals Intersects 25.0 m grading 2.7% CuEq (incl. 3.2 m at 6.3% CuEq) and 49.2 m grading 2.4% CuEq (incl. 10.4 m at 6.4% CuEq) at the Kay Mine Deposit

Arizona Metals Intersects 25.0 m grading 2.7% CuEq (incl. 3.2 m at 6.3% CuEq) and 49.2 m grading 2.4% CuEq (incl. 10.4 m at 6.4% CuEq) at the Kay Mine Deposit
Canada NewsWire
TORONTO, June 26, 2023

/NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR F…

Share this article:

Published

on

Arizona Metals Intersects 25.0 m grading 2.7% CuEq (incl. 3.2 m at 6.3% CuEq) and 49.2 m grading 2.4% CuEq (incl. 10.4 m at 6.4% CuEq) at the Kay Mine Deposit

Canada NewsWire

/NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES/

TORONTO, June 26, 2023 /CNW/ – Arizona Metals Corp. (TSX: AMC) (OTCQX: AZMCF) (the “Company” or “Arizona Metals”) is pleased to announce the latest drilling results from its Kay Mine Deposit in Arizona.

Hole KM-23-106 intersected 25.0 meters grading 2.7% copper equivalent (CuEq), including 3.2 meters at 6.3% CuEq. At 17 m further downhole, this hole also intersected 49.2 meters at 2.4% CuEq (including 10.4 meters at 6.4% CuEq). At a further 10 m downhole, this hole also intersected 5.2 m at 1.0% CuEq. This hole confirms the high-grade copper and gold mineralization previously encountered in hole KM-21-21A, located 30 meters above, which intersected 63 m grading 4.2 g/t AuEq. Moreover, it continues the mineralization 30 meters above hole KM-22-41, which intersected 96.7 m grading 2.9% CuEq.

In addition to these promising results, drilling at the Western Target has been ongoing since February 2023. The first four holes, KM-23-104, branch hole KM-23-104A, KM-23-107, and KM-23-108 have been completed, and assays are currently pending. In order to continue testing the strike extent of the West Target, hole KM-23-109 is targeting an area approximately 150 meters south of KM-23-104. Hole KM-23-110 will target the area between holes KM-23-104 and KM-23-107, with the goal of testing beneath recently reported high-grade surface samples (see Fig. 5).

The drill rig at the Kay Mine Deposit is targeting extensions of the high-grade mineralization encountered in hole KM-23-103, which intersected 10.5 m grading 6.2% CuEq. This rig will also focus on areas with lower drill density, including the northern part of the deposit and shallow areas above a depth of 200 meters (see Fig. 3).  The Company intends to drill test all areas open to expansion. See Figure 3 for priority target areas for drilling.  Independent consulting firms have been engaged to model drill data as holes are completed and assays become available. The Company intends to complete drilling of all priority targets before finalizing a maiden resource estimate.

Marc Pais, CEO, commented “The high-grade copper and gold drill results reported today continue to demonstrate the expansion potential of the Kay Mine Deposit, which we believe is part of a much larger property-wide mineralized system. We are also pleased to report that drilling of the fifth and sixth holes at the Western Target has commenced, following up visual mineralization previously reported in holes 104 and 104A. Downhole electromagnetic surveying of the first two Western Target holes has been completed and data are currently being analyzed. Surface outcrop sampling at the Western Target has returned significant grades of both copper and gold, extending the strike length of mineralization exposed at surface in this area to approximately 800 meters.”

With the completion of recent drill holes, Arizona Metals has drilled a total of 83,400 meters on the Kay property, and successfully completed its Phase 2 drill program of 75,000 meters. The Company is fully-funded (with $49 million in cash as of March 31, 2023) to complete the remaining 75,000 m of the 76,000-meter Phase 3 program (budgeted at $31.5 million), which will be used to test the numerous parallel targets heading west of the Kay Mine Deposit, as well as possible northern and southern extensions.

Figure 1. Cross-section view looking north at the Kay Mine Deposit, showing assay intervals in drilling reported in this release. See Tables 1-3 for additional details. The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 76%. (CNW Group/[nxtlink id=

Figure 2. Long section view looking north showing assay intervals for hole KM-23-106 in the Kay Mine Deposit. See Tables 1-3 for additional details. The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 76%. (CNW Group/[nxtlink id=

Figure 3. Long section displaying new drill hole intervals reported in this release (labels highlighted yellow). See Tables 1-3 for additional details. The true width of mineralization in this area is yet to be determined. See Table 1 for constituent elements, grades, metals prices and recovery assumptions used for AuEq g/t and CuEq % calculations. Analyzed metal equivalent calculations are reported for illustrative purposes only. (CNW Group/[nxtlink id=

Figure 4. Core from hole KM-23-106 between 559.8 m and 562.4 m downhole, which is part of a broader interval of 10.4 m grading 5.1% copper, 3.1 g/t gold, 0.5 % zinc, and 23 g/t silver. See Table 1 for constituent elements, grades, metals prices and recovery assumptions used for CuEq % calculations. Analyzed metal equivalent calculations are reported for illustrative purposes only. (CNW Group/[nxtlink id=

Permitting Update

The Company currently has 11 drill pads permitted through the Bureau of Land Management (BLM) under a Notice of Intent to Explore. All permits are fully bonded and in good standing. Last week BLM staff conducted an annual inspection of the Kay project, verifying that the Company is in compliance with all permitted activities. Recently completed structural mapping and soil sampling programs have identified a number of new, highly prospective targets not previously located by geophysical methods. The Company is currently mapping a number of new drill pads to test these targets and will be applying to the BLM for an Exploration Plan of Operations. This more expansive permit will allow for additional roads and drill pads giving the Company the ability to test these additional targets.

West Target Surface Sampling

Recent surface mapping and sampling on the West target (Figure 5) has extended the mineralized horizon that was drilled in holes 104 and 104A and previously sampled at surface, where it returned 8.6% Cu. Nine new surface samples all returned percent-grade Cu, up to 4.9% Cu, and averaging 2.9% Cu. These samples also contained anomalous Au, up to 0.5 g/t Au. The surface strike length of mineralization exposed at surface in this area is now approximately 800 m. These surface samples suggest increasing intensity of mineralization to the north; along with data gathered in the drill holes completed and underway, these results will be used to refine drill targeting on the West Target.

Figure 5. Plan view displaying drill holes completed and underway at the Western Target, as well as results of recent outcrop surface sampling north of the Western Target EM Conductivity Anomaly. See Table 5 below of sample assay details. (CNW Group/[nxtlink id=

Figure 6. Cross section of the Western Target looking north, showing current and completed drill holes and mineralization intersected in drill hole KM-23-104. (CNW Group/[nxtlink id=

Shareholder Update Webinar

The Company will host a virtual-only shareholder update webinar on Monday, July 17, 2023, from 11-12am EST.

The shareholder update webinar will be facilitated by Marc Pais, CEO and Morgan Knowles, Vice President, Investor Relations who will review the Company’s most recent drilling results as well as discuss milestones, financial strength, and the outlook for the remainder of the fiscal year. The Company’s CEO, Marc Pais, and VP Investor Relations, Morgan Knowles will facilitate pre-submitted and live-chat questions and answers.

Investors are asked to submit their questions to: [email protected]

Webinar Login details:

Topic: Arizona Metals Corp. (TSX:AMC, OTCQX:AZMCF) Shareholder Webinar
Time: Jul 17, 2023 11:00 AM Eastern Time (US and Canada)

Join shareholder update webinar:
https://us02web.zoom.us/j/81979704873?pwd=RkhmbkRhbHZBRjFsV3lOL29idGJRQT09

Meeting ID: 819 7970 4873
Passcode: 340147

Table 1. Results of Phase 2 Drill Program at the Kay Mine Project, Yavapai County, Arizona announced in this news release.

Analyzed Grade

Analyzed Metal Equivalent

 Metal Equivalent

Hole ID

From m

To m

Length m

Cu %

Au g/t

Zn %

Ag g/t

Pb %

Cu eq %

Au eq g/t

Zn eq%

Cu eq %

Au eq g/t

Zn eq%

KM-23-106

476.3

501.2

25.0

0.37

1.61

3.68

33.4

0.90

3.23

5.30

8.41

2.71

4.44

7.04

including

491.0

494.2

3.2

1.13

3.86

8.53

63.5

1.03

7.50

12.29

19.51

6.29

10.30

16.35

including

500.3

501.2

0.9

0.43

15.15

2.70

272.0

3.62

13.67

22.40

35.55

10.10

16.55

26.26

KM-23-106

517.4

566.6

49.2

1.15

1.19

1.71

14.4

0.44

2.75

4.50

7.15

2.35

3.86

6.13

including

556.3

566.6

10.4

5.10

3.05

0.47

22.6

0.01

7.33

12.01

19.06

6.35

10.40

16.51

KM-23-106

576.1

581.3

5.2

0.02

1.37

0.61

20.5

0.24

1.31

2.14

3.40

0.99

1.62

2.57

 

The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 76%. (2) Assumptions used in USD for the copper and gold metal equivalent calculations were metal prices of $4.63/lb Copper, $1937/oz Gold, $25/oz Silver, $1.78/lb Zinc, and $1.02/lb Pb. Assumed metal recoveries (rec.), based on a preliminary review of historic data by SRK and ProcessIQ1, were 93% for copper, 92% for zinc, 90% for lead, 72% silver, and 70% for gold. The following equation was used to calculate copper equivalence: CuEq = Copper (%) (93% rec.) + (Gold (g/t) x 0.61)(72% rec.) + (Silver (g/t) x 0.0079)(72% rec.) + (Zinc (%) x 0.3844)(93% rec.) +(Lead (%) x 0.2203)(93% rec.). The following equation was used to calculate gold equivalence: AuEq = Gold (g/t)(72% rec.) + (Copper (%) x 1.638)(93% rec.) + (Silver (g/t) x 0.01291)(72% rec.) + (Zinc (%) x 0.6299)(93% rec.) +(Lead (%) x 0.3609)(93% rec.). Analyzed metal equivalent calculations are reported for illustrative purposes only. The metal chosen for reporting on an equivalent basis is the one that contributes the most dollar value after accounting for assumed recoveries.

Table 2. Full results of Phase 2 Drill Program at the Kay Mine Deposit, Yavapai County, Arizona.

Analyzed Grade

Analyzed Metal Equivalent

 Metal Equivalent

Hole ID

From m

To m

Length m

Cu %

Au g/t

Zn %

Ag g/t

Pb %

Cu eq %

Au eq g/t

Zn eq%

Cu eq %

Au eq g/t

Zn eq%

KM-21-17

429.5

449.9

20.4

1.81

1.10

1.20

21.2

0.17

3.14

5.15

8.18

2.73

4.47

7.10

including

429.5

434.0

4.6

4.61

1.73

1.91

29.1

0.24

6.68

10.96

17.39

5.92

9.70

15.39

including

432.7

434.0

1.4

0.52

6.81

8.29

40.0

1.10

8.41

13.79

21.89

6.76

11.09

17.60

KM-21-17

504.4

505.4

0.9

1.19

4.73

0.05

9.0

0.00

4.17

6.83

10.84

3.20

5.24

8.31

KM-21-18

404.3

429.8

25.5

0.35

0.86

1.71

15.8

0.23

1.71

2.80

4.44

1.43

2.35

3.72

including

408.6

410.6

2.0

0.50

2.22

7.25

64.4

0.82

5.33

8.74

13.87

4.51

7.39

11.72

including

424.9

427.3

2.4

1.60

2.59

3.16

18.0

0.52

4.66

7.64

12.12

3.92

6.43

10.21

KM-21-18A

391.4

423.8

32.5

1.09

0.62

1.25

17.7

0.15

2.13

3.48

5.53

1.85

3.04

4.82

including

393.3

395.8

2.4

9.57

2.83

2.72

40.9

0.28

12.73

20.87

33.12

11.36

18.63

29.56

KM-21-19

377.8

378.3

0.5

3.39

5.59

6.83

128.0

0.63

10.58

17.34

27.52

8.81

14.44

22.92

KM-21-20

442.7

443.6

0.9

2.56

0.52

3.52

18.5

0.14

4.40

7.22

11.45

3.98

6.52

10.34

KM-21-20

456.0

458.1

2.1

1.49

0.35

0.14

6.0

0.04

1.81

2.97

4.71

1.63

2.66

4.23

KM-21-21

452.6

495.5

42.8

0.80

0.78

1.52

15.1

0.15

2.01

3.29

5.22

1.73

2.83

4.49

including

488.7

493.5

4.8

0.26

2.50

6.13

27.6

0.54

4.48

7.34

11.65

3.74

6.13

9.73

KM-21-21A

422.0

431.4

9.4

1.17

0.57

2.25

8.6

0.36

2.53

4.15

6.58

2.25

3.68

5.85

KM-21-21A

439.1

502.1

63.0

0.45

1.28

3.14

58.8

0.77

3.08

5.04

8.00

2.57

4.21

6.67

including

465.0

481.9

16.9

0.52

2.45

4.05

80.9

0.99

4.43

7.26

11.53

3.62

5.94

9.42

KM-21-22

679.4

682.8

3.4

0.79

0.95

0.06

12.0

0.01

1.49

2.44

3.87

1.23

2.01

3.20

KM-21-23

394.4

401.4

7.0

0.36

0.93

1.94

13.5

1.17

2.05

3.35

5.32

1.73

2.84

4.51

KM-21-23

438.6

459.2

20.6

0.17

1.18

1.93

27.8

0.37

1.94

3.17

5.03

1.58

2.59

4.11

KM-21-24

501.2

592.1

90.8

0.45

1.33

3.42

44.6

0.41

3.02

4.95

7.86

2.53

4.15

6.59

including

501.2

521.7

20.4

1.34

1.70

6.35

113.1

0.66

5.86

9.60

15.24

4.99

8.18

12.99

including

520.9

521.7

0.8

1.75

16.50

9.55

574.0

1.22

20.31

33.29

52.82

15.57

25.52

40.50

including

575.9

592.1

16.2

0.16

2.50

6.00

44.4

0.79

4.51

7.40

11.74

3.75

6.14

9.74

including

588.7

590.4

1.7

0.47

9.98

23.70

18.2

0.13

15.84

25.96

41.20

13.21

21.65

34.36

KM-21-25

662.6

741.3

78.6

1.41

2.33

2.79

43.4

0.35

4.33

7.10

11.26

3.61

5.92

9.40

including

663.2

672.7

9.4

8.06

1.84

1.31

92.3

0.15

10.45

17.13

27.18

9.30

15.24

24.19

including

693.0

703.9

11.0

0.68

6.28

10.40

99.7

1.17

9.56

15.66

24.86

7.79

12.77

20.27

KM-21-25A

654.7

719.9

65.2

1.04

1.94

2.15

18.9

0.18

3.25

5.32

8.44

2.71

4.43

7.04

including

655.5

662.8

7.3

3.66

2.09

1.85

30.2

0.21

5.93

9.73

15.44

5.17

8.47

13.44

including

710.8

716.9

6.1

2.72

7.95

3.73

37.4

0.31

9.37

15.36

24.38

7.52

12.33

19.56

KM-21-25B

647.2

648.9

1.7

0.13

0.58

2.41

62.1

0.64

2.04

3.35

5.31

1.70

2.79

4.42

KM-21-25B

655.6

659.9

4.3

0.93

0.91

0.91

25.3

0.19

2.07

3.40

5.40

1.75

2.88

4.56

KM-21-25B

666.0

667.8

1.8

0.60

0.72

2.98

33.5

0.43

2.55

4.18

6.63

2.20

3.61

5.72

KM-21-25B

673.3

674.7

1.4

0.08

2.10

2.39

23.0

0.33

2.53

4.15

6.58

2.01

3.29

5.23

KM-21-25B

681.2

682.6

1.4

0.09

1.54

2.98

11.0

0.35

2.34

3.83

6.08

1.93

3.16

5.01

KM-21-26

506.7

582.8

76.0

0.79

1.61

4.23

32.7

0.54

3.78

6.19

9.83

3.21

5.27

8.36

including

511.1

526.1

14.9

0.73

1.78

9.68

43.3

0.77

6.05

9.92

15.74

5.26

8.63

13.69

including

573.8

582.8

9.0

4.02

6.06

3.32

18.2

0.19

9.18

15.04

23.87

7.64

12.52

19.87

KM-21-27

706.8

738.2

31.4

1.58

0.16

0.69

9.0

0.06

2.03

3.33

5.28

1.85

3.03

4.80

KM-21-27

764.4

777.4

13.0

2.85

0.48

0.17

8.5

0.02

3.29

5.39

8.55

2.97

4.87

7.73

KM-21-27A

666.3

769.4

103.1

0.79

1.06

1.90

35.8

0.42

2.54

4.17

6.62

2.15

3.52

5.59

including 

666.3

687.0

20.7

3.21

1.39

1.26

19.4

0.20

4.74

7.77

12.33

4.18

6.84

10.86

including 

706.4

724.6

18.3

0.69

2.69

4.70

92.2

1.21

5.13

8.41

13.35

4.22

6.91

10.97

including 

752.9

763.8

11.0

0.07

1.07

4.68

95.3

0.98

3.49

5.73

9.09

2.92

4.78

7.59

KM-21-27B

665.8

762.9

97.1

1.31

1.62

3.21

31.7

0.40

3.88

6.35

10.08

3.31

5.42

8.61

including

702.0

723.0

21.0

0.87

4.56

9.03

81.5

1.10

8.01

13.13

20.83

6.63

10.87

17.25

including

723.0

738.2

15.2

4.97

0.36

0.42

18.7

0.05

5.51

9.03

14.33

5.04

8.26

13.11

KM-21-28

640.7

694.9

54.3

1.87

2.85

5.03

29.4

0.70

5.93

9.72

15.43

5.04

8.26

13.12

including

660.2

671.6

11.4

0.54

4.29

9.30

32.2

1.17

7.24

11.87

18.84

6.04

9.89

15.70

including

681.1

689.0

7.9

4.39

9.47

10.34

93.1

2.41

15.42

25.27

40.10

12.80

20.98

33.29

including

690.4

692.6

2.2

16.06

0.82

0.06

55.8

0.01

17.02

27.90

44.28

15.62

25.61

40.64

KM-21-29

393.0

393.8

0.8

0.43

1.54

4.92

9.0

0.21

3.38

5.54

8.79

2.89

4.74

7.53

KM-21-30

264.9

267.9

3.0

1.18

0.02

0.01

1.5

0.00

1.21

1.98

3.15

1.12

1.83

2.91

KM-21-32

316.4

320.0

3.7

1.84

1.29

2.47

38.5

0.30

3.95

6.47

10.27

3.41

5.60

8.88

KM-21-32

342.9

345.9

3.0

0.67

0.52

2.70

13.0

0.15

2.16

3.54

5.62

1.90

3.12

4.95

KM-21-32

358.9

368.4

9.4

0.60

1.47

1.99

45.7

0.35

2.70

4.42

7.01

2.22

3.63

5.76

KM-21-33

171.3

172.5

1.2

3.79

0.45

0.21

63.0

0.17

4.69

7.68

12.19

4.19

6.86

10.89

KM-21-34

299.3

303.9

4.6

0.29

1.69

0.94

46.3

0.26

2.12

3.47

5.50

1.65

2.70

4.29

KM-21-34

309.7

310.9

1.2

2.27

0.56

1.55

19.9

0.08

3.38

5.54

8.80

3.03

4.96

7.87

KM-21-35

609.6

615.1

5.5

0.92

1.26

1.71

57.7

0.02

2.80

4.60

7.29

2.33

3.82

6.06

including

609.6

613.0

3.4

1.39

1.69

1.98

54.0

0.01

3.61

5.92

9.40

3.03

4.96

7.87

KM-21-38

406.5

407.8

1.4

0.60

1.08

9.41

4.0

0.25

4.96

8.13

12.90

4.42

7.24

11.49

KM-21-38

467.4

476.1

8.7

0.09

1.73

3.87

61.1

1.22

3.38

5.55

8.80

2.78

4.56

7.23

including

470.0

475.2

5.2

0.12

2.44

5.68

87.5

1.79

4.88

8.01

12.71

4.02

6.59

10.46

KM-21-40

589.8

613.8

24.0

4.98

0.61

0.98

23.4

0.45

6.01

9.86

15.65

5.46

8.95

14.21

including

589.8

597.9

8.1

7.63

0.43

0.39

27.1

0.17

8.30

13.60

21.58

7.61

12.47

19.78

KM-21-40

627.9

680.8

52.9

0.47

2.91

3.40

35.7

0.40

3.93

6.44

10.22

3.17

5.20

8.25

including

641.1

648.3

7.2

1.15

7.66

8.27

88.5

0.92

9.90

16.23

25.76

7.95

13.03

20.68

including

670.3

674.1

3.8

1.53

10.89

9.47

24.6

0.61

12.15

19.91

31.59

9.69

15.88

25.19

KM-21-41

462.6

559.3

96.7

1.04

1.54

2.66

40.8

0.35

3.41

5.59

8.86

2.87

4.71

7.47

including

503.2

514.2

11.0

0.99

5.34

8.17

106.3

1.63

8.59

14.08

22.35

7.02

11.51

18.26

including

546.7

558.1

11.4

5.86

5.83

3.24

185.4

0.04

12.14

19.90

31.58

10.15

16.64

26.40

including

553.1

556.9

3.8

7.11

9.55

5.70

505.8

0.09

19.16

31.41

49.84

15.62

25.59

40.62

KM-21-42

803.5

810.3

6.9

0.05

1.60

1.58

64.3

0.35

2.22

3.64

5.78

1.73

2.83

4.49

KM-21-42

835.5

839.7

4.3

0.63

2.46

2.15

21.7

0.21

3.18

5.20

8.26

2.56

4.20

6.67

KM-21-42

853.7

854.7

0.9

0.11

1.63

2.88

28.0

0.40

2.52

4.13

6.55

2.05

3.37

5.34

KM-21-42A

786.7

787.6

0.9

0.03

3.61

2.18

17.0

0.70

3.36

5.51

8.74

2.58

4.22

6.70

KM-21-42A

805.4

811.1

5.6

6.17

0.92

0.18

39.5

0.01

7.12

11.68

18.53

6.43

10.54

16.72

including

807.0

808.9

2.0

10.72

0.87

0.11

61.8

0.00

11.79

19.32

30.66

10.74

17.60

27.93

KM-21-42A

840.9

877.2

36.3

0.55

0.62

1.35

10.7

0.13

1.56

2.56

4.06

1.34

2.20

3.49

KM-21-42B

808.0

811.2

3.2

0.29

2.06

5.77

63.0

0.94

4.47

7.33

11.63

3.74

6.13

9.72

KM-21-42B

816.9

819.9

3.0

2.31

0.66

1.23

16.0

0.15

3.35

5.49

8.71

2.99

4.90

7.77

KM-21-42B

835.5

840.8

5.3

0.02

0.73

2.93

13.5

0.24

1.75

2.87

4.56

1.49

2.45

3.88

KM-21-42C

849.2

877.4

28.2

3.81

0.47

0.29

12.5

0.09

4.32

7.08

11.24

3.93

6.44

10.23

including

849.2

854.7

5.5

14.57

0.66

0.16

37.5

0.03

15.34

25.14

39.89

14.11

23.12

36.70

including

863.8

869.4

5.6

2.29

1.17

0.59

13.1

0.25

3.39

5.55

8.81

2.96

4.85

7.70

including

874.8

877.4

2.6

2.83

0.26

0.03

7.2

0.01

3.06

5.02

7.96

2.80

4.59

7.28

KM-21-42C

886.1

889.1

3.0

0.87

0.88

0.50

5.2

0.05

1.65

2.71

4.30

1.40

2.30

3.65

KM-21-43

583.7

607.1

23.4

0.39

0.25

3.68

3.1

0.02

1.98

3.25

5.15

1.79

2.93

4.65

including

598.9

599.8

0.9

0.50

0.18

11.30

3.0

0.03

4.99

8.17

12.97

4.56

7.48

11.87

KM-21-43

616.0

633.1

17.1

1.81

0.17

0.14

8.2

0.03

2.04

3.34

5.31

1.86

3.05

4.84

including

631.2

633.1

1.8

6.30

0.61

0.09

25.0

0.01

6.91

11.32

17.97

6.30

10.32

16.38

KM-21-44

353.4

377.3

23.9

0.34

0.97

2.52

18.3

0.33

2.12

3.47

5.50

1.79

2.93

4.65

including

354.0

356.6

2.6

0.23

2.14

7.97

38.9

0.68

5.06

8.29

13.15

4.30

7.05

11.19

KM-21-45

459.6

463.0

3.4

0.32

0.62

6.63

82.3

0.87

4.10

6.71

10.65

3.55

5.82

9.24

including

461.2

462.1

0.9

0.15

1.23

16.90

182.0

2.50

9.39

15.38

24.41

8.17

13.39

21.26

KM-21-46

350.4

362.9

12.4

0.66

2.61

3.69

40.6

0.39

4.08

6.69

10.61

3.34

5.48

8.70

including

350.4

353.3

2.8

0.77

5.19

6.83

107.0

0.72

7.58

12.42

19.70

6.11

10.01

15.88

KM-21-47

433.9

435.9

2.0

0.16

1.88

9.28

138.7

2.17

6.46

10.58

16.79

5.46

8.95

14.20

KM-21-48

605.2

610.7

5.5

3.54

0.45

0.19

12.7

0.05

4.00

6.55

10.40

3.63

5.95

9.45

KM-21-48

630.3

634.6

4.3

1.11

0.34

0.69

12.7

0.11

1.71

2.80

4.45

1.52

2.49

3.95

KM-21-48

685.5

696.8

11.3

0.98

0.05

0.06

4.2

0.02

1.07

1.75

2.77

0.98

1.60

2.54

KM-21-48

715.1

718.4

3.4

2.08

0.04

0.03

4.3

0.01

2.15

3.52

5.59

1.98

3.25

5.16

KM-21-48

723.0

724.5

1.5

1.54

0.07

0.06

4.0

0.02

1.64

2.68

4.26

1.51

2.47

3.92

KM-21-48

735.5

743.6

8.1

0.34

0.60

1.52

9.2

0.07

1.38

2.26

3.59

1.18

1.93

3.06

KM-21-48A

538.0

539.5

1.5

0.31

1.17

2.79

29.0

0.52

2.44

4.01

6.36

2.05

3.35

5.32

KM-21-48A

687.9

696.9

9.0

1.64

0.36

0.79

7.9

0.01

2.23

3.66

5.80

2.01

3.29

5.22

including

687.9

688.8

0.9

0.15

1.53

5.35

5.0

0.01

3.18

5.21

8.27

2.71

4.45

7.06

including

694.9

696.0

1.1

8.36

0.80

0.10

40.0

0.03

9.21

15.10

23.96

8.39

13.75

21.81

KM-21-49

lost hole

 

The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 76%. (2) Assumptions used in USD for the copper and gold metal equivalent calculations were metal prices of $4.63/lb Copper, $1937/oz Gold, $25/oz Silver, $1.78/lb Zinc, and $1.02/lb Pb. Assumed metal recoveries (rec.), based on a preliminary review of historic data by SRK and ProcessIQ2, were 93% for copper, 92% for zinc, 90% for lead, 72% silver, and 70% for gold. The following equation was used to calculate copper equivalence: CuEq = Copper (%) (93% rec.) + (Gold (g/t) x 0.61)(72% rec.) + (Silver (g/t) x 0.0079)(72% rec.) + (Zinc (%) x 0.3844)(93% rec.) +(Lead (%) x 0.2203)(93% rec.). The following equation was used to calculate gold equivalence: AuEq = Gold (g/t)(72% rec.) + (Copper (%) x 1.638)(93% rec.) + (Silver (g/t) x 0.01291)(72% rec.) + (Zinc (%) x 0.6299)(93% rec.) +(Lead (%) x 0.3609)(93% rec.). Analyzed metal equivalent calculations are reported for illustrative purposes only. The metal chosen for reporting on an equivalent basis is the one that contributes the most dollar value after accounting for assumed recoveries.

Table 3. Full results to date of Phase 2 Drill Program at the Kay Mine Deposit, Yavapai County, Arizona. See Table 2 for width and metal equivalency notes.

Analyzed Grade

Analyzed Metal Equivalent

 Metal Equivalent

Hole ID

From m

To m

Length m

Cu %

Au g/t

Zn %

Ag g/t

Pb %

Cu eq %

Au eq g/t

Zn eq%

Cu eq %

Au eq g/t

Zn eq%

KM-21-50

489.5

501.9

12.3

0.98

2.30

6.36

111.9

1.24

5.99

9.81

15.57

5.02

8.24

13.07

including

489.5

493.0

3.4

2.64

3.59

9.49

207.7

1.65

10.49

17.20

27.30

8.86

14.52

23.05

KM-21-50

509.0

562.1

53.1

0.44

0.84

1.28

35.8

0.27

1.79

2.93

4.65

1.48

2.42

3.84

including

538.1

545.6

7.5

0.28

1.94

2.62

112.8

0.82

3.55

5.81

9.23

2.82

4.63

7.34

KM-21-51B

860.5

870.2

9.8

3.00

0.13

0.10

6.5

0.05

3.18

5.21

8.27

2.93

4.80

7.62

including

864.7

865.6

0.9

8.70

0.09

0.09

16.0

0.10

8.93

14.64

23.24

8.27

13.55

21.51

KM-21-51B

881.5

884.2

2.7

0.52

0.22

0.62

28.3

0.14

1.15

1.88

2.98

0.99

1.61

2.56

KM-21-51B

893.7

903.4

9.8

1.51

0.10

0.06

4.4

0.01

1.63

2.67

4.24

1.49

2.45

3.89

including

898.2

899.3

1.1

6.56

0.11

0.10

15.0

0.04

6.79

11.13

17.67

6.28

10.29

16.32

KM-21-52

751.5

758.2

6.7

1.18

0.66

0.98

18.2

0.14

2.14

3.50

5.56

1.86

3.05

4.84

KM-21-52

787.5

789.6

2.1

0.04

1.27

1.68

28.5

0.22

1.73

2.84

4.50

1.38

2.25

3.58

KM-21-52A

763.7

793.1

29.4

0.25

1.12

1.36

51.6

0.47

1.97

3.22

5.11

1.58

2.58

4.10

including

763.7

764.9

1.2

0.38

3.01

8.69

132.0

1.68

6.97

11.43

18.13

5.80

9.50

15.08

including

771.8

774.5

2.7

1.39

2.46

4.59

116.4

1.82

5.98

9.81

15.56

5.00

8.19

12.99

including

781.5

787.6

6.1

0.31

2.63

1.64

119.5

0.65

3.64

5.97

9.47

2.81

4.60

7.30

KM-21-52A

801.3

802.5

1.2

0.42

0.90

1.29

82.0

0.17

2.15

3.52

5.59

1.73

2.83

4.50

KM-21-52A

818.8

820.2

1.4

0.39

1.62

1.29

188.0

0.36

3.45

5.65

8.96

2.66

4.35

6.91

KM-21-52A

831.2

852.4

21.2

0.05

0.91

0.80

27.2

0.29

1.19

1.95

3.10

0.93

1.52

2.42

including

837.0

841.6

4.6

0.03

2.16

1.34

69.0

0.79

2.59

4.24

6.73

1.98

3.24

5.14

KM-21-55

302.7

308.5

5.8

0.66

0.44

0.53

15.8

0.10

1.28

2.10

3.33

1.10

1.80

2.86

KM-21-56

434.6

435.9

1.2

1.53

0.39

0.13

19.0

0.01

1.97

3.23

5.12

1.75

2.86

4.54

KM-21-56

499.1

501.5

2.4

1.53

0.18

7.15

6.4

0.02

4.45

7.29

11.57

4.07

6.68

10.59

including

499.1

500.2

1.1

1.97

0.31

14.55

7.0

0.02

7.81

12.81

20.33

7.16

11.73

18.61

KM-21-56

524.0

525.0

1.1

0.97

0.12

0.07

5.0

0.03

1.12

1.83

2.91

1.01

1.66

2.64

KM-21-56

558.2

563.6

5.3

0.82

0.99

3.09

27.0

0.06

2.84

4.65

7.38

2.44

4.00

6.35

KM-21-56

577.0

578.2

1.2

0.02

1.66

0.47

5.0

0.02

1.26

2.06

3.27

0.92

1.52

2.41

KM-21-57

776.5

784.3

7.8

0.26

2.30

2.59

57.9

0.68

3.27

5.36

8.51

2.61

4.28

6.79

including

777.8

778.8

0.9

0.25

6.62

11.45

105.0

3.33

10.26

16.81

26.68

8.37

13.72

21.77

KM-21-57

819.9

835.5

15.5

1.29

2.17

2.58

90.9

0.27

4.39

7.19

11.41

3.61

5.92

9.40

including

824.0

827.5

3.5

3.69

4.67

3.81

228.5

0.29

9.88

16.19

25.69

8.13

13.33

21.15

KM-21-57

852.5

853.6

1.1

0.30

3.10

2.33

92.0

0.57

3.94

6.46

10.25

3.06

5.02

7.97

KM-21-57A

728.6

735.5

6.9

2.49

1.04

0.57

6.6

0.02

3.40

5.57

8.84

3.00

4.92

7.81

KM-21-57A

759.6

821.4

61.9

1.08

2.60

3.73

32.0

0.50

4.46

7.31

11.60

3.71

6.08

9.65

including

762.3

783.3

21.0

0.42

6.78

9.49

67.9

0.49

8.84

14.50

23.00

7.12

11.67

18.52

KM-22-57B

736.7

862.0

125.3

1.41

0.83

1.27

12.4

0.13

2.53

4.14

6.57

2.21

3.62

5.74

including

739.7

741.6

1.8

9.42

2.37

0.32

8.5

0.03

11.06

18.12

28.76

9.93

16.28

25.84

including

798.3

805.6

7.3

6.35

0.81

3.76

19.5

0.14

8.47

13.89

22.04

7.72

12.65

20.08

KM-22-57C

784.3

885.1

100.9

1.24

1.54

1.56

25.8

0.14

3.02

4.95

7.85

2.54

4.16

6.61

including

829.4

837.9

8.5

1.60

7.71

9.04

100.9

0.35

10.66

17.47

27.72

8.62

14.14

22.43

including

852.2

857.6

5.3

6.81

0.10

0.09

23.3

0.02

7.10

11.63

18.46

6.55

10.73

17.03

KM-21-58

577.0

586.4

9.4

0.43

1.28

2.48

41.3

0.47

2.59

4.25

6.74

2.15

3.52

5.59

KM-21-58

614.2

682.6

68.4

1.30

3.42

3.85

47.2

0.50

5.35

8.78

13.93

4.40

7.22

11.45

including

640.7

648.0

7.3

0.79

4.34

10.20

51.9

0.56

7.90

12.94

20.54

6.60

10.83

17.18

including

668.1

678.6

10.5

5.30

12.19

6.67

194.7

1.88

17.26

28.30

44.90

13.98

22.92

36.37

including

668.1

669.6

1.5

2.55

43.20

7.76

856.0

0.80

38.86

63.69

101.08

28.62

46.90

74.43

KM-21-58A

569.4

641.8

72.5

1.12

1.00

2.84

18.1

0.33

3.03

4.97

7.89

2.64

4.32

6.86

including

584.3

591.9

7.6

0.29

1.19

6.23

4.4

0.40

3.53

5.79

9.19

3.09

5.06

8.02

including

602.3

613.3

11.0

4.02

0.11

1.38

12.6

0.40

4.80

7.88

12.50

4.42

7.25

11.51

including

630.3

630.9

0.7

1.14

6.35

11.20

356.0

0.65

12.28

20.13

31.95

9.89

16.21

25.73

including

633.5

641.8

8.3

1.53

2.33

5.12

26.5

0.36

5.20

8.53

13.53

4.45

7.29

11.56

KM-21-58A

665.5

676.0

10.5

0.12

2.90

3.88

167.5

1.92

5.13

8.41

13.34

4.06

6.65

10.55

including

672.5

676.0

3.5

0.12

6.89

6.40

332.0

3.81

10.26

16.82

26.70

7.98

13.07

20.74

including

673.6

674.5

0.9

0.28

19.65

12.65

844.0

10.20

26.07

42.74

67.82

19.97

32.73

51.94

KM-21-58B

543.2

627.6

84.4

1.05

2.38

3.44

23.8

0.55

4.13

6.77

10.75

3.45

5.66

8.98

including

571.2

582.5

11.3

0.51

5.27

9.96

35.4

1.52

8.18

13.40

21.27

6.76

11.08

17.58

including

605.3

622.7

17.4

3.20

6.19

4.18

40.9

0.22

8.96

14.69

23.31

7.38

12.09

19.19

including

609.6

612.0

2.4

1.45

17.73

7.97

82.5

0.44

16.08

26.35

41.81

12.29

20.15

31.97

KM-22-59A

903.7

905.9

2.1

0.61

0.10

0.65

10.3

0.10

1.02

1.68

2.66

0.92

1.50

2.38

KM-22-60

554.7

648.0

93.3

1.36

5.65

3.25

32.6

0.34

6.39

10.47

16.62

5.08

8.32

13.21

including

591.6

597.7

6.1

0.58

5.62

12.00

56.3

1.40

9.37

15.37

24.38

7.78

12.75

20.24

including

627.0

644.5

17.5

5.22

25.37

4.71

100.6

0.59

23.44

38.42

60.98

18.05

29.59

46.95

including

634.3

635.5

1.2

5.63

273.00

0.18

715.0

0.28

177.99

291.74

462.98

126.03

206.57

327.82

KM-22-61

560.8

580.0

19.2

0.72

0.20

0.69

7.0

0.06

1.18

1.93

3.07

1.05

1.73

2.74

KM-22-62

636.6

682.8

46.2

0.22

1.47

3.22

53.5

0.47

2.89

4.73

7.51

2.37

3.89

6.18

including

644.4

646.2

1.8

0.89

4.36

19.26

133.0

0.77

12.18

19.96

31.68

10.41

17.07

27.09

including

650.7

657.5

6.8

0.34

3.21

9.59

145.2

1.79

7.53

12.34

19.59

6.26

10.26

16.29

including

663.2

665.5

2.3

0.53

8.66

7.82

181.6

1.55

10.60

17.38

27.58

8.30

13.61

21.60

KM-22-62

704.1

706.2

2.1

0.36

2.88

3.33

61.5

0.46

3.99

6.53

10.37

3.18

5.22

8.28

KM-22-62A

582.2

643.6

61.4

0.31

1.27

2.65

40.8

0.58

2.55

4.18

6.64

2.11

3.47

5.50

including

593.1

602.4

9.3

1.15

2.29

4.37

52.4

0.91

4.85

7.94

12.60

4.08

6.68

10.60

including

608.9

617.8

8.8

0.20

1.79

4.26

91.2

1.15

3.90

6.40

10.15

3.20

5.25

8.33

including

627.7

630.9

3.2

0.41

7.10

15.01

180.0

2.77

12.56

20.58

32.66

10.31

16.89

26.81

KM-22-62A

653.8

660.5

6.7

0.26

1.69

2.58

90.4

0.75

3.17

5.19

8.24

2.54

4.17

6.61

KM-22-62B

590.9

599.4

8.5

1.48

0.47

1.04

21.6

0.27

2.39

3.92

6.23

2.12

3.47

5.51

KM-22-62B

606.2

629.0

22.7

0.20

1.05

1.77

21.2

0.23

1.75

2.86

4.54

1.43

2.35

3.73

including

623.8

629.0

5.2

0.21

3.61

6.52

56.6

0.81

5.55

9.09

14.43

4.53

7.42

11.78

KM-22-62C

613.6

630.3

16.8

0.57

0.40

0.48

20.5

0.11

1.18

1.94

3.07

1.01

1.65

2.62

KM-22-62C

638.3

653.8

15.5

0.25

2.34

3.34

34.8

0.34

3.31

5.43

8.62

2.68

4.39

6.97

including

648.5

653.8

5.3

0.32

4.21

6.57

74.7

0.73

6.18

10.12

16.06

5.00

8.19

13.00

KM-22-63

982.2

983.1

0.9

3.41

1.23

2.19

47.0

0.24

5.43

8.90

14.12

4.79

7.85

12.45

KM-22-63A

no significant assays

KM-22-63B

890.3

891.8

1.5

0.10

0.47

0.43

15.0

0.08

0.68

1.12

1.77

0.54

0.89

1.41

KM-22-63C

no significant assays

KM-22-63D

no significant assays

KM-22-64

317.4

325.5

8.1

1.13

0.09

2.30

14.3

0.08

2.20

3.60

5.72

2.00

3.27

5.20

KM-22-65

334.4

337.1

2.7

1.39

0.06

0.34

7.0

0.03

1.62

2.65

4.21

1.48

2.43

3.86

KM-22-66

384.4

414.8

30.5

1.00

0.11

0.09

3.0

0.01

1.13

1.85

2.94

1.03

1.69

2.68

KM-22-67

340.2

345.9

5.8

0.38

0.06

0.55

4.4

0.09

0.69

1.13

1.79

0.62

1.02

1.61

KM-22-68

407.2

408.7

1.5

1.71

0.49

0.08

8.4

0.06

2.11

3.46

5.49

1.88

3.08

4.89

KM-22-68

435.9

446.5

10.7

0.54

0.18

0.29

4.3

0.04

0.80

1.31

2.08

0.71

1.17

1.85

KM-22-69

342.0

343.6

1.6

1.19

0.87

0.96

25.7

0.06

2.30

3.78

5.99

1.97

3.24

5.14

KM-22-70

lost hole

KM-22-71

631.2

648.5

17.3

0.53

0.16

0.21

9.6

0.01

0.78

1.28

2.03

0.69

1.12

1.78

KM-22-71

657.8

668.6

10.8

3.18

0.35

0.16

22.6

0.01

3.64

5.96

9.46

3.29

5.40

8.57

including

657.8

661.4

3.7

6.75

0.28

0.09

30.9

0.02

7.20

11.81

18.74

6.61

10.83

17.19

KM-22-71A

554.3

561.4

7.2

0.39

0.22

0.64

10.3

0.22

0.90

1.47

2.34

0.78

1.29

2.04

KM-22-72

637.6

660.2

22.6

0.34

0.38

1.15

13.0

0.27

1.18

1.93

3.06

1.01

1.66

2.63

KM-22-72

669.3

671.3

2.0

0.17

2.15

4.15

23.1

0.56

3.38

5.55

8.80

2.79

4.57

7.25

KM-22-73

no significant assays

KM-22-74

649.2

688.2

39.0

0.40

1.77

3.39

30.5

0.32

3.09

5.07

8.05

2.56

4.20

6.67

including

652.6

659.8

7.2

0.68

2.57

5.13

18.0

0.11

4.39

7.19

11.42

3.67

6.02

9.55

including

678.5

688.2

9.8

0.15

3.08

5.67

32.0

0.51

4.57

7.50

11.90

3.74

6.13

9.73

KM-22-74

716.3

719.6

3.4

0.03

0.84

2.65

37.5

0.57

1.99

3.26

5.17

1.65

2.71

4.30

KM-22-75

690.7

692.8

2.1

0.23

0.25

0.84

9.3

0.22

0.83

1.36

2.15

0.71

1.17

1.86

KM-22-75

705.0

716.9

11.9

0.67

0.17

0.30

8.0

0.05

0.97

1.58

2.51

0.86

1.41

2.24

KM-22-75

723.1

731.7

8.5

0.31

0.50

1.27

11.6

0.09

1.21

1.99

3.16

1.03

1.69

2.69

KM-22-75

753.5

754.5

1.1

0.23

1.22

1.85

12.0

0.04

1.78

2.92

4.64

1.46

2.39

3.80

KM-22-76

no significant assays

KM-22-77

no significant assays

KM-22-78

no significant assays

KM-22-79

667.8

673.8

5.9

0.11

0.52

1.03

6.9

0.23

0.93

1.52

2.42

0.77

1.27

2.02

KM-22-79

681.8

689.8

7.9

2.12

1.38

3.14

47.2

0.27

4.61

7.55

11.98

4.00

6.55

10.40

KM-22-80

672.8

678.5

5.6

0.35

0.59

0.68

4.9

0.02

1.02

1.67

2.65

0.85

1.40

2.22

KM-22-80

702.9

705.9

3.0

0.13

0.04

0.99

1.0

0.01

0.54

0.89

1.41

0.49

0.81

1.28

KM-22-81

813.8

822.4

8.5

0.10

0.22

0.69

15.5

0.11

0.65

1.07

1.69

0.54

0.89

1.42

KM-22-81A

847.7

852.8

5.2

0.03

0.19

2.04

46.2

0.48

1.40

2.29

3.64

1.19

1.94

3.09

KM-22-81B

801.8

805.6

3.8

9.60

1.81

1.83

44.6

0.23

11.81

19.36

30.72

10.65

17.45

27.70

including

802.7

804.2

1.5

14.80

2.75

2.06

53.0

0.28

17.75

29.10

46.18

16.03

26.27

41.69

KM-22-81B

815.0

816.0

0.9

0.93

0.56

0.49

28.0

0.21

1.72

2.82

4.48

1.47

2.41

3.83

KM-22-81B

821.6

823.0

1.4

0.02

0.03

1.92

28.0

0.40

1.09

1.78

2.83

0.95

1.56

2.47

KM-22-81B

836.5

837.3

0.8

0.05

0.74

0.69

15.0

0.46

0.99

1.62

2.57

0.79

1.29

2.04

KM-22-81C

751.5

754.7

3.2

1.14

0.43

0.56

19.6

0.07

1.79

2.94

4.66

1.57

2.57

4.08

KM-22-81C

775.9

784.0

8.1

0.21

0.13

1.01

18.8

0.22

0.88

1.44

2.29

0.76

1.25

1.99

KM-22-81C

787.0

788.5

1.5

0.03

2.02

1.80

30.0

0.39

2.27

3.73

5.92

1.77

2.91

4.61

KM-22-82

226.5

228.0

1.5

0.14

0.07

1.58

5.4

0.53

0.95

1.55

2.46

0.85

1.40

2.22

KM-22-82

301.8

304.2

2.4

1.18

0.37

0.13

2.6

0.02

1.48

2.42

3.84

1.32

2.16

3.42

KM-22-83

no significant assays

KM-22-84

no significant assays

KM-22-85

no significant assays

KM-22-86

lost hole

KM-22-86A

545.9

546.6

0.7

0.14

0.51

0.14

16.0

0.26

0.69

1.14

1.80

0.54

0.89

1.41

KM-22-86A

563.7

564.8

1.1

0.04

1.11

0.05

13.0

0.11

0.86

1.42

2.25

0.63

1.03

1.63

KM-22-86A

565.6

566.7

1.1

0.05

0.15

0.92

25.9

0.43

0.80

1.30

2.07

0.67

1.10

1.74

KM-22-87

339.9

348.1

8.2

0.29

0.31

0.23

2.0

0.01

0.59

0.96

1.53

0.50

0.82

1.30

including

339.9

340.5

0.6

1.89

0.09

0.04

4.0

0.02

1.99

3.26

5.17

1.83

3.00

4.76

KM-22-88

344.7

345.6

0.9

2.84

0.07

0.06

2.0

0.02

2.93

4.80

7.61

2.71

4.44

7.04

KM-22-89

447.1

448.5

1.4

1.09

0.29

0.06

5.8

0.11

1.36

2.23

3.53

1.21

1.99

3.15

KM-22-90

no significant assays

KM-22-91

399.3

401.1

1.8

0.72

0.66

0.20

3.5

0.02

1.23

2.02

3.21

1.05

1.72

2.73

KM-22-92

no significant assays

KM-22-93

478.7

483.3

4.5

1.85

0.03

0.02

4.6

0.00

1.91

3.13

4.97

1.77

2.90

4.60

KM-22-93

506.6

508.6

2.0

1.63

0.01

0.01

2.2

0.00

1.66

2.72

4.32

1.54

2.52

4.01

KM-22-93

522.4

527.0

4.6

0.85

0.05

0.02

2.6

0.00

0.90

1.48

2.35

0.83

1.36

2.16

KM-22-93

615.1

616.3

1.2

2.85

0.04

0.06

5.0

0.00

2.94

4.81

7.64

2.72

4.45

7.07

KM-22-94

797.4

815.0

17.7

0.73

0.04

0.06

3.1

0.01

0.81

1.33

2.11

0.74

1.22

1.93

including

797.4

798.7

1.4

1.43

0.03

0.02

3.7

0.02

1.49

2.44

3.87

1.37

2.25

3.58

KM-22-94

829.4

832.6

3.2

0.54

0.75

0.48

6.9

0.06

1.25

2.05

3.26

1.05

1.71

2.72

KM-22-94

854.5

855.8

1.3

0.76

0.09

0.02

2.0

0.00

0.84

1.37

2.18

0.76

1.25

1.99

KM-22-94A

829.1

832.4

3.4

2.18

0.03

0.07

5.2

0.05

2.27

3.73

5.91

2.10

3.44

5.47

including

829.1

829.7

0.6

9.43

0.10

0.27

22.0

0.23

9.82

16.09

25.54

9.08

14.88

23.61

KM-22-94A

850.1

853.4

3.4

0.63

0.11

0.02

2.4

0.02

0.73

1.20

1.90

0.66

1.08

1.71

KM-22-94A

858.9

864.9

5.9

0.62

0.02

0.02

2.3

0.01

0.67

1.09

1.74

0.61

1.01

1.60

KM-22-94A

871.9

882.2

10.4

1.21

0.09

0.05

3.6

0.01

1.31

2.15

3.42

1.20

1.97

3.13

KM-22-95

432.8

435.6

2.7

0.22

0.12

0.61

4.1

0.02

0.57

0.94

1.48

0.50

0.83

1.31

KM-22-96

no significant assays

KM-23-97

512.2

521.0

8.8

2.87

2.24

2.65

27.7

0.31

5.54

9.08

14.41

4.78

7.83

12.43

including

516.1

517.7

1.6

8.12

3.67

2.33

61.2

0.14

11.76

19.28

30.60

10.31

16.91

26.83

including

516.8

517.2

0.4

17.10

4.59

0.40

59.0

0.08

20.54

33.67

53.43

18.36

30.09

47.75

KM-23-97

595.3

596.8

1.5

0.95

0.80

0.03

9.0

0.01

1.52

2.50

3.97

1.29

2.11

3.36

KM-23-98

255.7

258.8

3.0

0.53

0.13

0.11

3.5

0.01

0.69

1.12

1.78

0.61

1.00

1.59

KM-23-98

312.4

317.0

4.6

0.70

0.06

0.13

4.1

0.02

0.82

1.35

2.14

0.75

1.23

1.95

KM-23-98

342.9

347.2

4.3

0.75

0.33

0.06

3.3

0.00

1.00

1.64

2.60

0.88

1.44

2.28

KM-23-99

459.8

462.8

3.0

0.61

0.28

0.44

7.0

0.09

1.02

1.67

2.65

0.90

1.47

2.33

KM-23-99

508.3

517.9

9.6

0.04

0.59

0.74

2.0

0.03

0.70

1.15

1.82

0.56

0.92

1.47

KM-23-100

305.5

310.0

4.5

1.33

0.29

0.40

16.9

0.05

1.81

2.96

4.70

1.61

2.64

4.19

KM-23-100

366.1

367.9

1.8

0.39

0.06

0.29

3.8

0.06

0.58

0.95

1.51

0.52

0.86

1.36

KM-23-100

387.4

388.7

1.3

0.65

0.11

0.03

1.3

0.00

0.74

1.21

1.92

0.67

1.10

1.74

KM-23-101

670.1

672.4

2.3

0.79

0.83

0.01

2.9

0.00

1.33

2.17

3.45

1.11

1.82

2.89

KM-23-102

345.6

350.1

4.4

0.52

0.14

0.18

2.7

0.05

0.71

1.16

1.85

0.64

1.04

1.65

KM-23-103

386.3

396.9

10.5

2.40

3.25

6.09

36.1

0.85

7.20

11.80

18.72

6.15

10.08

16.00

including

387.9

390.6

2.7

0.86

8.21

16.08

42.5

1.39

12.69

20.80

33.01

10.51

17.22

27.33

including

392.9

394.4

1.5

7.55

1.82

2.62

26.0

0.14

9.90

16.23

25.76

8.90

14.59

23.15

KM-23-103

500.8

504.3

3.5

0.55

0.23

0.03

1.7

0.00

0.72

1.17

1.86

0.63

1.03

1.64

KM-23-105

553.2

560.5

7.3

0.22

2.87

4.90

202.8

1.46

5.79

9.49

15.06

4.61

7.56

12.00

including

557.5

559.5

2.0

0.57

6.05

8.26

418.8

1.58

11.11

18.20

28.89

8.74

14.32

22.73

KM-23-105

572.9

601.7

28.8

0.22

0.70

1.09

39.1

0.26

1.43

2.35

3.73

1.17

1.91

3.03

including

573.5

575.8

2.3

1.07

1.34

7.28

246.3

1.57

6.99

11.46

18.18

5.86

9.61

15.25

KM-23-106

476.3

501.2

25.0

0.37

1.61

3.68

33.4

0.90

3.23

5.30

8.41

2.71

4.44

7.04

including

491.0

494.2

3.2

1.13

3.86

8.53

63.5

1.03

7.50

12.29

19.51

6.29

10.30

16.35

including

500.3

501.2

0.9

0.43

15.15

2.70

272.0

3.62

13.67

22.40

35.55

10.10

16.55

26.26

KM-23-106

517.4

566.6

49.2

1.15

1.19

1.71

14.4

0.44

2.75

4.50

7.15

2.35

3.86

6.13

including

556.3

566.6

10.4

5.10

3.05

0.47

22.6

0.01

7.33

12.01

19.06

6.35

10.40

16.51

KM-23-106

576.1

581.3

5.2

0.02

1.37

0.61

20.5

0.24

1.31

2.14

3.40

0.99

1.62

2.57

 

Table 4. Results of Phase 1 Drill Program at the Kay Mine Deposit, Yavapai County, Arizona. The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 80%.

Analyzed Grade

Analyzed Metal Equivalent

Hole ID

From m

To m

Length m

Cu %

Au g/t

Zn %

Ag g/t

Pb %

Cu eq %

Au eq g/t

Zn eq%

KM-20-01

275.8

281.5

5.6

0.57

0.48

1.20

11.6

0.18

1.70

1.61

4.51

including

275.8

276.5

0.6

0.50

1.22

5.04

32.0

0.73

4.23

4.01

11.22

including

279.8

281.5

1.6

1.21

0.98

1.49

22.6

0.23

3.10

2.94

8.22

KM-20-02

297.8

300.8

3.0

0.77

0.20

0.04

1.4

0.01

1.01

0.96

2.69

KM-20-03

256.3

259.1

2.7

3.40

1.01

0.65

69.6

0.09

5.41

5.13

14.35

including

256.3

257.3

0.9

7.42

1.79

1.11

56.0

0.17

10.32

9.78

27.37

KM-20-03

292.2

292.6

0.5

2.43

0.19

0.15

2.0

0.04

2.72

2.57

7.20

KM-20-03

295.4

295.8

0.5

1.35

0.80

0.91

6.0

0.06

2.61

2.47

6.92

KM-20-03A

252.4

256.9

4.6

3.70

2.55

0.27

35.6

0.03

6.85

6.49

18.15

including

252.4

253.1

0.8

9.74

6.34

0.40

164.0

0.11

18.19

17.24

48.23

KM-20-05

266.6

269.0

2.4

6.47

1.94

0.57

43.3

0.14

9.19

8.71

24.37

including

266.6

267.8

1.2

10.60

2.21

1.05

50.0

0.26

13.89

13.16

36.83

KM-20-06

267.9

281.5

13.5

1.02

0.85

1.23

45.6

0.30

2.92

2.77

7.75

including

267.9

268.4

0.5

1.54

2.20

6.10

31.0

0.81

6.73

6.38

17.85

including

276.6

281.5

4.9

1.86

0.87

1.96

92.1

0.42

4.54

4.30

12.04

including

280.0

281.0

1.1

3.22

1.03

0.64

340.0

0.04

7.82

7.41

20.74

KM-20-09

588.1

588.4

0.3

0.91

1.74

1.86

15.0

0.40

3.72

3.52

9.86

KM-20-09

613.4

614.1

0.7

0.90

1.81

1.04

10.0

0.08

3.32

3.15

8.81

KM-20-09

614.6

614.9

0.3

2.64

0.36

0.98

19.0

0.10

3.60

3.41

9.54

KM-20-09

632.8

638.9

6.1

0.12

4.18

8.02

41.7

0.82

8.23

7.80

21.83

including

633.6

637.9

4.4

0.15

5.46

9.06

33.1

0.50

9.81

9.29

26.00

including

636.9

637.9

1.1

0.17

9.77

14.65

68.0

0.78

16.92

16.03

44.86

KM-20-10

563.6

568.5

4.9

2.39

2.16

3.27

24.9

0.31

6.24

5.92

16.55

including

563.6

566.6

3.0

3.66

2.42

3.16

28.2

0.32

7.78

7.38

20.64

including

567.2

568.5

1.2

0.33

2.52

5.10

28.4

0.43

5.33

5.05

14.12

KM-20-10

574.2

574.9

0.6

0.12

4.33

11.30

113.0

0.16

10.09

9.56

26.75

KM-20-10

577.7

579.3

1.6

0.03

0.70

4.38

45.9

0.68

3.09

2.93

8.20

KM-20-10

582.3

583.1

0.8

0.03

0.42

2.90

51.0

1.07

2.42

2.29

6.40

KM-20-10A

521.2

522.5

1.3

2.13

1.27

7.46

51.1

0.91

7.07

6.70

18.75

KM-20-10A

527.9

538.6

10.7

1.32

1.66

2.58

27.2

0.30

4.40

4.17

11.66

including

527.9

529.4

1.5

6.69

0.92

1.62

30.2

0.07

8.59

8.14

22.77

including

532.2

535.3

3.1

0.72

1.75

2.99

34.3

0.42

4.17

3.95

11.07

including

537.2

538.6

1.4

0.16

7.29

9.06

79.2

0.60

12.24

11.60

32.44

KM-20-10B

503.0

530.7

27.6

0.87

0.97

1.76

21.3

0.32

2.87

2.72

7.61

including

503.0

509.6

6.6

1.78

1.55

2.55

29.8

0.37

4.79

4.54

12.70

including

513.9

518.3

4.4

1.08

1.89

4.05

47.4

0.68

5.29

5.01

14.02

including

527.2

530.7

3.5

1.91

2.32

3.93

52.9

0.99

6.68

6.33

17.72

KM-20-10C

523.9

530.7

6.8

0.58

3.32

5.84

102.0

1.15

7.65

7.25

20.28

including

523.9

528.2

4.3

0.88

4.89

7.61

125.2

1.45

10.60

10.05

28.11

including

525.6

526.4

0.8

0.52

16.65

21.40

214.0

2.76

29.15

27.62

77.29

KM-20-11

554.1

556.9

2.7

4.14

2.83

3.56

70.0

0.28

9.23

8.75

24.48

KM-20-12

371.9

376.7

4.9

3.99

0.37

0.62

12.4

0.07

4.76

4.51

12.61

including

371.9

373.7

1.9

8.49

0.67

1.53

28.0

0.16

10.10

9.57

26.77

KM-20-12

379.5

404.2

24.7

0.73

0.08

0.08

2.3

0.01

0.87

0.82

2.30

KM-20-12

371.9

404.2

32.3

1.19

0.12

0.14

3.8

0.01

1.35

2.20

3.50

including

372.7

376.7

4.1

4.80

0.44

0.75

14.9

0.08

5.50

9.01

14.30

KM-20-13

443.6

486.8

43.1

1.68

1.26

1.67

23.3

0.24

3.94

3.73

10.45

including

444.4

459.6

15.2

3.42

1.80

2.36

38.5

0.39

6.71

6.36

17.80

including

444.4

447.1

2.7

1.02

3.74

10.64

55.0

1.88

10.14

9.61

26.89

including

451.4

455.8

4.4

8.41

1.18

0.16

65.3

0.02

10.34

9.80

27.42

KM-20-14

421.7

461.6

39.9

1.47

1.00

1.67

18.4

0.19

3.40

3.22

9.00

including

426.3

429.8

3.5

9.56

1.28

0.95

30.0

0.07

11.58

10.98

30.71

including

457.2

460.7

3.5

0.36

2.58

8.33

26.3

0.38

6.61

6.26

17.52

KM-20-14A

404.6

409.0

4.4

1.67

1.48

2.50

79.2

0.41

5.07

4.80

13.44

including

404.6

406.4

1.7

4.08

2.46

5.02

173.6

0.53

10.41

9.87

27.61

KM-20-14A

421.0

443.5

22.5

0.86

0.72

1.51

15.9

0.18

2.41

2.28

6.38

including

421.0

421.8

0.8

9.81

2.91

1.69

45.0

0.19

14.01

13.28

37.15

including

421.0

425.0

4.1

3.23

1.14

1.30

21.4

0.14

5.17

4.90

13.71

KM-20-15

506.8

510.1

3.3

0.05

0.33

3.73

192.0

1.75

4.24

4.02

11.25

KM-20-16

480.4

518.8

38.4

0.85

0.81

2.24

24.3

0.25

2.87

2.72

7.61

including

480.4

492.9

12.5

1.63

1.98

4.23

48.5

0.50

5.95

5.64

15.78

including

480.4

483.4

3.0

2.40

4.74

7.49

77.9

0.91

11.29

10.70

29.93

including

489.8

492.9

3.0

3.61

2.59

6.90

100.7

0.92

10.22

9.68

27.10

 

Table 5. Western Target surface outcrop sampling results

SampleID

Cu_%

Au_ppm

Zn_ppm

CS-001

4.89

0.41

117

CS-002

1.43

0.10

231

CS-003

2.16

0.20

89

CS-004

3.20

0.19

88

CS-005

4.24

0.10

42

CS-006

1.62

0.10

158

JCS-001

3.91

0.20

122

JCS-002

1.77

0.20

123

JCS-003

3.20

0.48

96

 

About Arizona Metals Corp

Arizona Metals Corp owns 100% of the Kay Mine Project in Yavapai County, which is located on a combination of patented and BLM claims totaling 1,300 acres that are not subject to any royalties. An historic estimate by Exxon Minerals in 1982 reported a “proven and probable reserve of 6.4 million short tons at a grade of 2.2% copper, 2.8 g/t gold, 3.03% zinc, and 55 g/t silver.” (Fellows, M.L., 1982, Kay Mine massive sulfide deposit: Internal report prepared for Exxon Minerals Company, November 1982, 29 p.) The historic estimate at the Kay Mine Deposit was reported by Exxon Minerals in 1982. The historic estimate has not been verified as a current mineral resource. None of the key assumptions, parameters, and methods used to prepare the historic estimate were reported, and no resource categories were used.  Significant data compilation, re-drilling and data verification may be required by a “qualified person” (as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects) before the historic estimate can be verified and upgraded to be a current mineral resource. A qualified person has not done sufficient work to classify it as a current mineral resource, and Arizona Metals is not treating the historic estimate as a current mineral resource.

The Kay Mine Deposit is a steeply dipping VMS deposit that has been defined from a depth of 60 m to at least 900 m. It is open for expansion on strike and at depth.

The Company also owns 100% of the Sugarloaf Peak Property, in La Paz County, which is located on 4,400 acres of BLM claims. Sugarloaf is a heap-leach, open-pit target and has a historic estimate of “100 million tons containing 1.5 million ounces gold” at a grade of 0.5 g/t (Dausinger, 1983, Westworld Resources).

The historic estimate at the Sugarloaf Peak Property was reported by Westworld Resources in 1983. The historic estimate has not been verified as a current mineral resource. None of the key assumptions, parameters, and methods used to prepare the historic estimate were reported, and no resource categories were used.  Significant data compilation, re-drilling and data verification may be required by a qualified person before the historic estimate can be verified and upgraded to a current mineral resource. A qualified person has not done sufficient work to classify it as a current mineral resource, and Arizona Metals is not treating the historic estimate as a current mineral resource.

Qualified Person and Quality Assurance/Quality Control

All of Arizona Metals’ drill sample assay results have been independently monitored through a quality assurance/quality control (“QA/QC”) protocol which includes the insertion of blind standard reference materials and blanks at regular intervals. Logging and sampling were completed at Arizona Metals’ core handling facilities located in Phoenix and Black Canyon City, Arizona. Drill core was diamond sawn on site and half drill-core samples were securely transported to ALS Laboratories’ (“ALS”) sample preparation facility in Tucson, Arizona. Sample pulps were sent to ALS’s labs in Vancouver, Canada, for analysis.

Gold content was determined by fire assay of a 30-gram charge with ICP finish (ALS method Au-AA23). Silver and 32 other elements were analyzed by ICP methods with four-acid digestion (ALS method ME-ICP61a). Over-limit samples for Au, Ag, Cu, and Zn were determined by ore-grade analyses Au-GRA21, Ag-OG62, Cu-OG62, and Zn-OG62, respectively.

ALS Laboratories is independent of Arizona Metals Corp. and its Vancouver facility is ISO 17025 accredited. ALS also performed its own internal QA/QC procedures to assure the accuracy and integrity of results. Parameters for ALS’ internal and Arizona Metals’ external blind quality control samples were acceptable for the samples analyzed. Arizona Metals is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data referred to herein.

The qualified person who reviewed and approved the technical disclosure in this release is David Smith, CPG, a qualified person as defined in National Instrument43-101–Standards of Disclosure for Mineral Projects. Mr. Smith supervised the preparation of the scientific and technical information that forms the basis for this news release and has reviewed and approved the disclosure herein. Mr. Smith is the Vice-President, Exploration of the Company.  Mr. Smith supervised the drill program and verified the data disclosed, including sampling, analytical and QA/QC data, underlying the technical information in this news release, including reviewing the reports of ALS, methodologies, results, and all procedures undertaken for quality assurance and quality control in a manner consistent with industry practice, and all matters were consistent and accurate according to his professional judgement. There were no limitations on the verification process.

Disclaimer

This press release contains statements that constitute “forward-looking information” (collectively, “forward-looking statements”) within the meaning of the applicable Canadian securities legislation, All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements contained in this press release include, without limitation, statements regarding drill results and future drilling and assays, completion of the Phase 2 drill program, commencement and anticipated costs of the Phase 3 drill program, and the potential existence and size of VMS deposits at the Kay Mine Project. In making the forward- looking statements contained in this press release, the Company has made certain assumptions. Although the Company believes that the expectations reflected in forward-looking statements are reasonable, it can give no assurance that the expectations of any forward-looking statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: availability of financing; delay or failure to receive required permits or regulatory approvals; and general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this press release. Except as required by law, the Company disclaims any intention and assumes no obligation to update or revise any forward-looking statements to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward- looking statements or otherwise.

NEITHER THE TSX VENTURE EXCHANGE (NOR ITS REGULATORY SERVICE PROVIDER) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE

 ____________________________

1 SRK Consulting (Canada) Inc., March 2022, Updated Metallurgical Review, Kay Mine, Arizona. Report 3CA061.004

2 SRK Consulting (Canada) Inc., March 2022, Updated Metallurgical Review, Kay Mine, Arizona. Report 3CA061.004

 

SOURCE Arizona Metals Corp.

drill results
drilling
drill program
intersects
tsxv-amc
arizona-metals-corp
arizona metals corp
financing
press-release

Share this article:

Financing News

Capella Announces Definitive Agreement for the Sale of is Central Norway Copper-Cobalt Projects to NickelX and Financing Update

Capella Announces Definitive Agreement for the Sale of is Central Norway Copper-Cobalt Projects to NickelX and Financing Update
Canada NewsWire
VANCOUVER, BC, Oct. 17, 2023

VANCOUVER, BC, Oct. 17, 2023 /CNW/ – Capella Minerals Ltd (TSXV: CMIL) (OTC…

Share this article:

Published

on

By

Continue Reading
Financing News

Goldgroup Announces Exercise of Cerro Prieto Purchase Option

Vancouver, British Columbia–(Newsfile Corp. – October 17, 2023) – Goldgroup Mining Inc. (TSX: GGA) (OTC PINK: GGAZF) (BMV SIX: GGAN.MX) ("Goldgroup" or…

Share this article:

Published

on

By

Continue Reading
Drilling News

Canada Silver Cobalt Works Confirms Pegmatites up to 20 meters wide and 70 meters long at Sangster West

 

Pegmatite Confirmations and Advanced Geochemical Insights Propel Exploration Success

Coquitlam, BC – TheNewswire – October 17, 2023 – Canada Silver…

Share this article:

Published

on

By

Continue Reading

Trending